Each year, BCTC conducts a number of information sessions to get input into its Capital Plan. The Capital Plan is a comprehensive ten-year plan to sustain and expand the transmission system in BC to maintain reliability and meet growing demand. As part of this process, BCTC holds an annual Provincial Planning forum. Based on feedback from last year’s forum, the event this year was divided into a Public Information Session (held in June) and a technical session designed for a more industry oriented audience.
Please join us for a day of in-depth discussion about our Capital Plan and transmission planning in BC.
RSVP:
Please let us know if you are interested in attending the forum by contacting Christina Stoutenburg at 604.699.7531 or via email at christina.stoutenburg@bctc.com.
Address:
SFU Segal Graduate School of Business
500 Granville Street
Vancouver, BC
Presentation materials:
DISCLAIMER OF WARRANTY, LIMITATION OF LIABILITY
These presentations were prepared by BCTC solely for the purposes of discussion at the Technical Planning forum and they are based on information available to BCTC as of October 23, 2006. Accordingly, the presentations are suitable only for such purposes and subject to any changes arising after the date of the presentation. Unless otherwise expressly agreed by BCTC, BCTC does not represent or warrant the accuracy, completeness or usefulness of this information, for use or consideration by any third party. Nor does BCTC accept any liability out of reliance by a third party on this information, any errors or omissions. Any reliance by a third party is at their own risk.
Investing for the Future (PDF, 643KB)
Capital Planning Process (PDF, 1.52MB)
Interior to Lower Mainland Bulk System (PDF, 1.61MB)
Southern Interior Bulk System (PDF, 826KB)
BCTC's Expansion Policy (PDF, 71KB)