Preferred Route for Underground Transmission Circuits
BCTC has determined that the route option from the Sperling Substation to the proposed new Mount Pleasant Substation to the Cathedral Square Substation (Preliminary Route Option B) is the preferred route. As we move forward with detailed engineering design, the final alignment could vary from that shown in the map.
View a map of preferred route option (PDF, 1.8MB)
Preliminary Route Options for Underground Transmission Circuits
BCTC examined two preliminary routing options for new underground transmission circuits.
View a map of preliminary routing options (PDF, 77KB)