Interregional
The Interregional Studies section contains studies on transfer limits between the BCTC system and neighboring systems in Alberta and the USA.
- Facilities Studies for Alberta to US ATC (PDF, 282KB)
- Facilities Study for Power Supply 1000 MW Export on the BCHA X BPAT Path (PDF, 50KB)
- Facilities Study for Power Supply 1000 MW Export (PDF, 83KB)
- Alaska Intertie Study (PDF, 545KB, Posted: March 08, 2006)
- BC Import Capability Study (PDF, 94KB)
- US to AB Point-to-Point Study (PDF, 82KB, Posted November 15, 2007)
- System Impact Studies for Increasing Firm ATC from BC to Alberta and from BC Interior to the US (PDF, 54 KB, Posted: 04 April 2007)
- BC Hydro Import from Alberta (70610287,70610289,70610293,70610309,70610313, and 70610317) (PDF, 129KB,Posted August 2 2006)
- BC Hydro Import from Alberta (70604537) (PDF, 108KB, Posted 2 August 2006)
- NorthPoint 300 MW EAL>BPAT(70609893-70609922) (PDF, 172KB, Posted: 01 May 2006)
- NorthPoint 50 MW EAL>BPAT(70604454-55) (PDF, 157 KB, Posted 28 April 06)
- BC Hydro 275 MW Import From Alberta (978762) (PDF, 16KB)
- TransCanada 170 MW Wheelthrough to Alberta (485180) (PDF, 15KB)
- Columbia Power Corporation 150 MW Export (620107-109-115) (PDF, 8KB)
- BC Hydro 221 MW Import (420994) (PDF, 27KB)
- MacLaren - Pingston 32 MW Export to EAL May 9 (PDF, 136KB)
- Power Supply 1000 MW Import (PDF, 56KB)
- Power Supply 400 MW Import (PDF, 36KB)
- MacLaren 310037 System Impact Study (PDF, 37KB)
- MacLaren 310046 System Impact Study (PDF, 37KB)
- Information Release - Fortis BC Okanagan Transmission Reinforcement Project (PDF, 11KB, Posted February 7, 2008)
In this section: