BC Transmission Corporation: Building Connections
Careers
Contact Us
Vendor Opportunities
Search:
Go
About BCTC
Overview
Board & Executive
Careers
Community Investment
Corporate Reports
Newsroom
Organizational Chart
Our Commitments
Standards & Agreements
Strategic Vision
Vendor Opportunities
Community, Land & Safety
Overview
Aboriginal Relations
Community Investment
Electric and Magnetic Fields
Environmental Responsibility
Metal Theft Prevention
Right-of-Way Management
Safety
Trees & Vegetation
Projects
Overview
Events
Ashton Creek Project
Cathedral Square Substation
Central Vancouver Island Transmission Project
Interior to Lower Mainland (ILM) Transmission Reinforcement Project
Mission-Matsqui Transmission Reinforcement Project
Northwest Transmission Line Project
Saanich Peninsula Transmission Project
Southern Interior Series Compensation (SISC) Project
5L51 and 5L52 Transmission Upgrade Project (TUP)
Vancouver City Central Transmission (VCCT) Project
Vancouver Island Transmission Reinforcement
Transmission Planning
Overview
Capital Plan
Energy Plan
Engineering Studies & Data
Events
Innovation
Long Term Transmission Vision
Transmission Expansion Policy
Transmission System
Overview
Actual Flow Data
Balancing Authority Load Data
Engineering Studies & Data
Maps
Reliability
System Operating Orders
System Outages
Regulatory Filings
Overview
Capital Plan
Capital Projects
Revenue Requirements
Tariff
Other Filings
Generator Interconnection
Overview
Requirements
Standard Generator Interconnection Procedures
BC Hydro’s Calls for Power: Interconnection Procedures
Grandfathered Process
Queue
Engineering Standards
Engineering Studies & Data
Workshops & Presentations
FAQ
Contact Us
Transmission Scheduling
Overview
Agreements
Bulletins
Business Practices
Customer Service
OASIS
Settlements & Billing
Tariff & Pricing
Transaction Data
Transmission Services
Workshops & Presentations
Home
>
Transmission System
>
Engineering Studies & Data
>
Studies
>
Probabilistic Studies
> Selected Technical Reports
Selected Technical Reports
Probabilistic Risk Assessment of an Islanding Operation of Jordan River Generation
(PDF 375KB, Posted: November 9 2007)
Probabilistic Reliability Assessment of Qualicum Substation Reconfiguration
(PDF 401KB, Posted: November 9, 2007)
Probabilistic Reliability Assessment of Central Vancouver Island Transmission Project (Expected Energy Not Supplied Assesment)
(PDF 295KB, Posted: November 9, 2007)
Benefit/Cost Analysis Based on Reliability and Transmission Loss Considerations for Central Vancouver Island
(PDF 508KB, Posted: November 9, 2007)
“Cathedral Square Substation Contingency Plans Using Probabilistic Risk Assessment”, July 2006
(PDF133KB, POSTED: October 20/06)
“Reliability Assessment of 60L43 and 60L44”, June 2006
(PDF 71KB, POSTED: October 20/06)
“Probability Distribution of HVDC Capacity and Impacts of Two Key Components”, Report: BCTC-SPA-R003, May 5, 2004
(PDF 658KB, POSTED: October 20/06)
“Quantifying the Number of 138/25 kV 25 MVA Spare Transformers Required Using Probabilistic Risk Assessment”, April 2006
(PDF 93KB POSTED: October 20/06)
“Quantifying Mobile Transformers for Southern Interior and Vancouver Island Regions Using Probabilistic Risk Assessment”, April 2006
(PDF 152KB, POSTED: October 20/06)
“Reliability Assessment of Cathedral Square Substation”, March 2006
(PDF 208KB, POSTEED: October 20/06)
“Risk Assessment and Replacement Strategy for Cable 1 of HVDC Pole 1”, Report BCTC-SPPA-R010, February 27, 2006
(PDF 121KB, POSTED: October 20/06)
“Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part I: Reliability Improvements due to VITR”, Report BCTC-SPPA-R009A, December 8, 2005
(PDF 216KB, POSTED: October 20/06)
“
Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part II: Comparison between VITR and Sea Breeze HVDC Light Options”, Report BCTC-SPPA-R009B, December 23, 2005
(PDF 313KB, POSTED: October 20/06)
“Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part III: Reliability Analysis for Power Supply to Gulf Islands”, Report BCTC-SPPA-R009C, December 30, 2005
(PDF 166KB, POSTED: October 20/06)
“Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part IV: Effects of Existing HVDC on VI Power Supply Reliability”, Report BCTC-SPPA-R009D, January 9, 2006
(PDF 260KB, POSTED: October 20/06)
“Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part V: Monthly Reliability Profile of VITR”, Report BCTC-SPPA-R009E, January 24, 2006
(PDF 81KB, POSTED: October 20/06)
“Risk Evaluation of Meridian Substation Transformers”, Report BCTC-SPPA-R008, August 8, 2005
(PDF 75KB, POSTED: October 20/06)
“Impacts of Long Time Outage of Transformer T2 on Power Supply Reliability at Substation FVW”, Report BCTC-SPPA-R007, July 6, 2005
(PDF 47KB, POSTED: October 20/06)
“
Estimating End-of-Life Failure Probability of 2L53 Cable”, Report BCTC-SPPA-R006, June 29, 2005
(PDF 37KB, POSTED: October20/06 )
“Reliability Evaluation of Three Scenarios for Vancouver Island Power Supply - An Expected Energy Not Served (EENS) Study, BCTC Report: BCTC-SPA-R001, June 11, 2003
(PDF 192KB, POSTED: October 20/06)
Back to top
In this section:
Selected Publications & Other Resources
Transmission System
Overview
Actual Flow Data
Balancing Authority Load Data
Engineering Studies & Data
Maps
Reliability
System Operating Orders
System Outages
Privacy Policy
Terms of Use
Site Map
Subscribe
Copyright 2009 © British Columbia Transmission Corporation. All Rights Reserved.