Selected Technical Reports

  1. Probabilistic Risk Assessment of an Islanding Operation of Jordan River Generation  (PDF 375KB, Posted: November 9 2007)  
  2. Probabilistic Reliability Assessment of Qualicum Substation Reconfiguration (PDF 401KB, Posted: November 9, 2007)
  3. Probabilistic Reliability Assessment of Central Vancouver Island Transmission Project (Expected Energy Not Supplied Assesment) (PDF 295KB, Posted: November 9, 2007)
  4. Benefit/Cost Analysis Based on Reliability and Transmission Loss Considerations for Central Vancouver Island (PDF 508KB, Posted: November 9, 2007)
  5. “Cathedral Square Substation Contingency Plans Using Probabilistic Risk Assessment”, July 2006  (PDF133KB, POSTED: October 20/06)
  6. “Reliability Assessment of 60L43 and 60L44”, June 2006  (PDF 71KB, POSTED: October 20/06)
  7. “Probability Distribution of HVDC Capacity and Impacts of Two Key Components”, Report: BCTC-SPA-R003, May 5, 2004 (PDF 658KB, POSTED: October 20/06)
  8. “Quantifying the Number of 138/25 kV 25 MVA Spare Transformers Required Using Probabilistic Risk Assessment”, April 2006   
     (PDF 93KB POSTED: October 20/06)
  9. “Quantifying Mobile Transformers for Southern Interior and Vancouver Island Regions Using Probabilistic Risk Assessment”, April 2006  (PDF 152KB, POSTED: October 20/06)
  10. “Reliability Assessment of Cathedral Square Substation”, March 2006 (PDF 208KB, POSTEED: October 20/06)
  11. “Risk Assessment and Replacement Strategy for Cable 1 of HVDC Pole 1”, Report BCTC-SPPA-R010, February 27, 2006 (PDF 121KB, POSTED: October 20/06)
  12. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part I: Reliability Improvements due to VITR”, Report BCTC-SPPA-R009A, December 8, 2005 (PDF 216KB, POSTED: October 20/06)
  13. Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part II: Comparison between VITR and Sea Breeze HVDC Light Options”, Report BCTC-SPPA-R009B, December 23, 2005 (PDF 313KB, POSTED: October 20/06)
  14. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part III: Reliability Analysis for Power Supply to Gulf Islands”, Report BCTC-SPPA-R009C, December 30, 2005 (PDF 166KB, POSTED: October 20/06)
  15. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part IV: Effects of Existing HVDC on VI Power Supply Reliability”, Report BCTC-SPPA-R009D, January 9, 2006 (PDF 260KB, POSTED: October 20/06)
  16. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part V: Monthly Reliability Profile of VITR”, Report BCTC-SPPA-R009E, January 24, 2006
    (PDF 81KB, POSTED: October 20/06)
  17. “Risk Evaluation of Meridian Substation Transformers”, Report BCTC-SPPA-R008, August 8, 2005 (PDF 75KB, POSTED: October 20/06)
  18. “Impacts of Long Time Outage of Transformer T2 on Power Supply Reliability at Substation FVW”, Report BCTC-SPPA-R007, July 6, 2005 (PDF 47KB, POSTED: October 20/06)
  19. Estimating End-of-Life Failure Probability of 2L53 Cable”, Report BCTC-SPPA-R006, June 29, 2005 (PDF 37KB, POSTED: October20/06 )
  20. “Reliability Evaluation of Three Scenarios for Vancouver Island Power Supply - An Expected Energy Not Served (EENS) Study, BCTC Report: BCTC-SPA-R001, June 11, 2003 (PDF 192KB, POSTED: October 20/06)