Regional Studies
Regional Studies contains studies performed on transfer limits, area reinforcements, specific BCTC projects, and other studies that are regional in nature and internal to BC provincial boundaries.
- Assessment of Interior to Lower Mainland Transmission Network (PDF, 34KB)
- Burrard Re-Powering Impact On ILM Reinforcement - Draft (PFD, 635KB, Posted: 30 January, 2007)
- Lower Mainland Transfer Capacity Limits and Reinforcement Options - Revision 2 (PDF, 209KB, Posted: June 29, 2006)
- Lower Mainland Transfer Capacity Limits and Reinforcement Options - Revision 1 (PDF, 241 KB, Posted: March 24, 2006)
- Lower Mainland Transfer Capacity Limits and Reinforcement Options (PDF, 3.4MB)
- 5L83 - Incremental Available Power Delivery to Ingledow Substation (PDF, 381KB, Posted September 18, 2007)
- ILM System Impact Study (PDF, 33KB)
- Interior to Lower Mainland (ILM) Grid - Future Reinforcements (PDF, 39KB, Posted August 24, 2007)
- Interior to Lower Mainland Project - Costs (PDF, 14KB, Posted June 22, 2007)
- Interior to Lower Mainland Reinforcement Project (ILM) Update (PDF, 106KB, Posted: May 28, 2007)
- Information Release on the ILM Transmission Network (PDF, 28KB, Posted: October 4 2006)
- Potential Interior to Lower Mainland (ILM) Transmission Reinforcement Project (PDF, 76KB, Posted: April 28, 2006)
- Alcan Kitimat Smelter Modernization Project Remedial Action Scheme (RAS) Functional Requirements (PDF, 542KB, Posted: September 10, 2008)
- Alcan to BCTC Transfer Limit Update (Kemano with 7 Units) (PDF, 149KB, Posted: September 06, 2007)
- Alcan to BCTC Transfer Limit Update (Maximum Kemano Output: 880 MW) (PDF, 1.65MB, Revised June 1, 2007)
- Minette – Kitimat (2L103) Transfer Capability (PDF, 139KB)
- System Impact Study for Alcan Kitimat Smelter Modernization Project (PDF, 518KB, Posted: September 18, 2007)
- Transfer Limits of Alcan Exporting to BCTC Under System Normal Conditions (PDF, 331KB POSTED: 19 April 2007)
- Northern Interior Transfer Capacity Limits and Reinforcement Options - Revision 2 (PDF, 140KB, Posted June 29, 2006)
- Northwest Transmission Line Project - Construction Power Study (PDF, 443KB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 1 (PDF, 10.5MB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 2a (PDF, 9.2MB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 2b (PDF, 12MB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 3a (PDF, 14MB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 3b (PDF, 13.6MB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 4 (PDF, 381KB, Posted February 8, 2008)
- NTL Construction Power Study - Appendix 5 (PDF, 58KB, Posted February 8, 2008)
- Supplement to Preliminary Facility Ratings and System Data (PDF, 31KB, Posted September 13, 2007)
- Preliminary Facility Ratings and System Data (PDF, 3MB, Posted Aug 21, 2007)
- Northwest Transmission Project - Stage 1 (2009) - Construction Power Requirements (PDF, 648KB, Posted July 23, 2007)
- Northwest Transmission - Updated Engineering Cost Estimate (PDF, 18KB, Posted June 18 2007)
- Northwest Transmission - Clarification (PDF, 12KB, Posted Jan 18, 2007)
- Northwest Transmission Update - Project Consideration Update (PDF,39KB, Posted Jan 15, 2007)
- Further Details to September 8, 2006 Engineering Cost Estimate (PDF, 20KB, Posted Sept 29, 2006)
- Northwest Transmission Options - Engineering Cost Estimate (PDF, 40KB, Posted: September 8,2006)
- Northwest Transmission Options - Update as of August 30th 2006 (PDF, 12KB, Posted: August 30, 2006)
- Northwest Transmission Options - Update as of August 14th 2006 (PDF, 16KB, Posted: August 16, 2006)
- North West Area Transmission Options Bulletin Notice (PDF, 38KB)
- North West Area Transmission Options (PDF, 84KB)
- Cost Estimate Review - NW Transmission Options (PDF, 28KB)
- North West Area Transmission Options - Cost Estimate Breakdown Supplement (PDF, 34KB)
- BCTC Responses to Iskut First Nation Information Request (PDF, 22KB)
- Incremental Losses for Generation Near Skeena (PDF, 34KB, Posted August 30, 2007)
- System Impact Study of NITS Update for Mica and Revelstoke Peaking Units (CRP2) (PDF, 319KB, Posted: Sept 15, 2008)
- SEV Excitor Ceiling Voltage Reduction Impact Study (PDF, 120KB, Posted: August 21, 2008)
- Revelstoke G5 Integration Rev 4 (PDF, 157KB, Revised May 16, 2007)
- Revelstoke G5 Integration Rev 3 (PDF, 153 KB REVISED: September 29, 2006)
- Revelstoke G5 Integration Rev 1 (PDF, 140KB POSTED 12 July 2006)
- Study for Selkirk Station to Nicola Station (PDF, 234KB)
- Kamloops Area Reinforcement Options (PDF, 53KB, Posted: August 15, 2007)
- Woods Lake Area Reinforcement Options (PDF, 55KB, Posted: August 8, 2007)
- Preliminary System Integration Study: Mica and Revelstoke Peaking Units (Initial Stage) - Discussion Draft (PDF, 923 KB, Revised: August 3, 2007)
- South Interior Cut-Plane Reinforcement Justification Report (PDF, 421KB, Posted: October 11, 2006)
- Southern Interior Transfer Capacity Limits and Reinforcement Options - Revision 1 (PDF, 191 KB, Posted: March 24, 2006)
- IPP Generation Transfer Capability from Golden to Cranbrook (PDF, 51KB)
- Southern Interior Transfer Capacity Limits and Reinforcement Options (PDF, 2.7MB)
- Southern Interior Reinforcement Options (PDF, 27 KB, Posted: May 24, 2006)
- Vancouver Island Transfer Capacity Limits and Reinforcement Options - Revision 1 (PDF, 225 KB, Posted: March 24, 2006)
- Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project
- Part 1 - Reliability Improvements due to VITR (PDF, 216KB, Posted: February 6, 2006)
- Part 2 - Comparison between VITR and Sea Breeze HVDC Light Options (PDF, 313KB, Posted: February 6, 2006)
- Part 3 - Reliability Analysis for Power Supply to Gulf Islands (PDF, 166KB, Posted: February 6, 2006)
- Part 4 - Effects of Existing HVDC on VI Power Supply Reliability (PDF, 260KB, Posted: February 6, 2006)
- Vancouver Island Transfer Capability Limits (PDF, 63KB)
- INFORMATION RELEASE: Vancouver Island Transfer Capability Limits - Upgrade Options & Cost Estimates (PDF, 38KB)
- INFORMATION RELEASE: Information About Short Term Limitation of Cut-Plane D (PDF, 30KB)
- Questions and Answers Concerning Vancouver Island Supply (PDF, 15KB)
- Vancouver Island Transfer Capacity Limits and Reinforcement Options (PDF, 3.3MB)
In this section: