| SOO 7T-06 |
BC Hydro Integrated System and Vancouver Island Loads (PDF, 12KB) |
2006 May 26 |
| SOO 7T-10 |
Resynchronizing Generators Following Generator Shedding Operation (PDF, 19KB) |
2005 Aug 24 |
| SOO 7T-11 |
BCTC - BPA 230 kV Interconnection at Nelway (PDF, 8KB) |
2005 Oct 24 |
| SOO 7T-12 |
Reliability Must Run Generation Requirements (PDF, 73KB) |
2006 Apr 7 |
| SOO 7T-13 |
G.M. Shrum / Peace Canyon 500 kV System (PDF, 118KB) |
2007 Nov 1 |
| SOO 7T-14 |
Bridge River Operating Order (PDF, 147KB) |
2008 Jul 22 |
| SOO 7T-15 |
Impacts on Metro 230 kV Network of Increased Burrard Generation (PDF, 14KB) |
2007 Aug 30 |
| SOO 7T-17 |
B.C. - Alberta Interconnection (PDF, 175KB) |
2008 Jul 22 |
| SOO 7T-18 |
Custer - Ingledow 500 kV Interconnection (PDF, 114KB) |
2008 Jul 22 |
| SOO 7T-22 |
System Voltage Control (PDF, 51KB) |
2006 Feb 23 |
| SOO 7T-23B |
Vancouver Island - Mainland H.V.D.C. Transmission System (PDF, 65KB) |
2007 Jul 6 |
| SOO 7T-25 |
Bridge River 1 - Seton - Carquille - Hundred Mile 60 KV Operation (PDF, 73KB) |
2007 Mar 15 |
| SOO 7T-30 |
Williston - Skeena - Alcan Interconnection (PDF, 210KB) |
2007 Sep 13 |
| SOO 7T-33 |
South Interior Subsystem (PDF, 100KB) |
2008 Jan 3 |
| SOO 7T-34 |
South Interior Generation Shedding and Outage Requirements (PDF, 239KB) |
2008 Jun 5 |
| SOO 7T-40 |
Cheekye - Dunsmuir (PDF, 101KB) |
2008 Apr 16 |
| SOO 7T-42 |
Arnott - VIT 138 kV Interconnection (PDF, 17KB) |
2007 Sep 27 |
| SOO 7T-50 |
Voltage Stability Operating Limits and Procedures for Using the RT-VSA and VSA Applications (PDF, 617KB) |
2006 May 2 |
| SOO 7T-61 |
Voice and Data Link Operation Responsibility (COM-002) (PDF, 8KB) |
2008 Mar 12 |
| SOO 7T-62 |
Unscheduled Flow (USF) Reduction Procedure (PDF, 5KB) |
2006 Apr 28 |
| SOO 7T-63 |
Pacific Northwest Security Coordinator (PDF, 21KB) |
2006 Apr 28 |
| SOO 7T-64 |
BCTC Transfer Limits (PDF, 90KB) |
2007 Jul 12 |